La Center Bridge Construction Pictures


       BRIDGE FACT SHEET

  • Demolished Structure

  • Structure Length: 486 feet
  • Maximum Span Length: 140 feet
  • Number of Main Spans: 1
  • Number of Approach Spans: 6-south, 3-north
  • Year Built 1923
  • Main Span Type Concrete Arch-Deck
  • Approach Span Type Concrete Stringer/Multi Beam
  • Current ADT 6475 (1994)
  • Curb / Curb Deck Width 20.2 feet
  • Out / Out Deck Width 29.9 feet
  • Number of lanes 2
  • New Structure
  • Structure Length: 476 feet
  • Maximum Span Length: 162 feet
  • Number of Main Spans: 1
  • Number of Approach Spans: 2-south 1-north
  • Main Span Type Concrete Precast Girders
  • Approach Span Type Concrete Precast Girders
  • Curb / Curb Deck Width 40 feet
  • Out / Out Deck Width 45 feet
  • Number of lanes 2 - 12 foot with 8 foot shoulders
  • Sidewalk 1 – 6 foot separated from traffic by a traffic barrier
  • Schedule
  • Design Start: September, 1997
  • Design Completion: April 2000
  • Right-of-way Considerations: March, 1998
  • Construction Start: June 2000
  • Construction Completion September 2001

As of January 17, 2002, the bridge is nearly complete. The original supplier for the bridge railings went out of business last year. A new supplier was contacted and his shop drawings were approved on May 7, 2001. The majority of the pieces were placed last fall. A number of pieces had to be special ordered once the bulk of the railing was in place. These items are on back order waiting to be assembled. All material has been cut and anodized and is now being assembled and welded. Several units have been shipped and they anticipate that the balance should be shipped by January 28, 2002. These are the last items required for physical completion of the bridge.

  • Construction Cost $$5,400,000 (est)